Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 4 results ...

Deng, Y and Poon, S W (2013) Meeting sustainability challenges of mega-event flagships. Engineering, Construction and Architectural Management, 20(01), 46-62.

Lansley, P (2013) Research assessment and the activity hypothesis. Engineering, Construction and Architectural Management, 20(01), 7-28.

Tran, H and Carmichael, D G (2013) A contractor's classification of owner payment practices. Engineering, Construction and Architectural Management, 20(01), 29-45.

  • Type: Journal Article
  • Keywords: contractor payment; contractual claims; credit rating; owner classification; regression tree; risk; risk management; uncertainty
  • ISBN/ISSN: 0969-9988
  • URL: https://doi.org/10.1108/09699981311288664
  • Abstract:
    Purpose – A common distraction to contractors is that of cash management, and particularly incoming payments. In the extreme, a failure to manage a project's cash flows may bring about business failure. A contractor's financial viability rests on how actual payments from an owner are received. The purpose of this paper is to present a method for contractors to evaluate the punctuality and fullness of owner payments based on historical behaviour. Design/methodology/approach – Owners are classified according to their late and incomplete payment practices. The payment profile of an owner, in the form of aging payments received based on claims, is used as a basis for the method's development. Regression trees are constructed based on three predictor variables, namely, the average time to payment following a claim, the total amount ending up being paid within a certain period and the level of variability in claim response times. Findings – The method will be of interest to contractors concerned with managing their cash positions, as well as those persons looking at contractor-owner relationships. Practical implications – The method is intended to be used internally within a contractor's organisation to assist in decision making. The method can also be used by subcontractors, suppliers, and consultants. Owners may use the method reflectively to improve their own practices, to save time and cost by reducing disputes, and to develop better owner-contractor relationships. Originality/value – This paper represents an original approach, and an original contribution to contractor pre-tendering risk analysis practices, and an extension to contractor claim-payment analysis.

Yik, F W H, Lai, J H K, Chan, K T, Chau, C K and Lee, W L (2013) A portrait of building services engineers in Hong Kong. Engineering, Construction and Architectural Management, 20(01), 63-82.